Prowse Court

The team completed fire remediation works to 88 existing balconies at Prowse Court. The scope included; the removal of existing cladding, insulation and sub frame, installation of new carrier rail framing, new fire breaks, new insulation and new non-combustible cladding to all 88 individual inset balconies and associated decking replacement.

The team completed fire remediation works to 88 existing balconies at Prowse Court. The scope included; the removal of existing cladding, insulation and sub frame, installation of new carrier rail framing, new fire breaks, new insulation and new non-combustible cladding to all 88 individual inset balconies and associated decking replacement.

University of East London

A replacement of the full external façade of 3 residential blocks within a built-up estate. The façades are a mix of render, brick and spandrel panels. All decking from balconies and terraces are replaced with aluminium. Arte has taken this project from an early stage and is currently working up the designs with the Fire Engineers to ensure a compliant EWS1 form is provided. We are working on a live building that impacts on car parking. A temporary car park requiring planning is currently being pursued.

A replacement of the full external façade of 3 residential blocks within a built-up estate. The façades are a mix of render, brick and spandrel panels. All decking from balconies and terraces are replaced with aluminium. Arte has taken this project from an early stage and is currently working up the designs with the Fire Engineers to ensure a compliant EWS1 form is provided. We are working on a live building that impacts on car parking

Dalston Junction

A replacement of cladding on 14 of the residential blocks that sit above the Dalston main line station. The tallest is an 18-story residential block. A mix of timber, rain screen with K15 insulation and timber balcony elements are being replaced with compliant materials.

A replacement of cladding on 14 of the residential blocks that sit above the Dalston main line station. The tallest is an 18-story residential block. A mix of timber, rain screen with K15 insulation and timber balcony elements are being replaced with compliant materials.

New Website for 2024

Welcome to Arte Construction’s Latest News and Blog Page! Stay updated with the latest developments, industry insights, and project highlights. Explore our articles, case studies, and expert opinions to discover valuable resources and inspiration for your construction projects. From innovative design trends to practical construction tips, our blog covers a wide range of topics to keep you informed and engaged.

We are excited to present our New Website for 2024, with thanks to the team at “The IT Heroes”

Great West Quarter

Arte have been instructed to undertake a highly sensitive and major recladding project in Brentford West London, where the collection of buildings owned by a range of house associations.

Morris House

Morris House is a complete building refurbishment. It was built in 2005 and has since deteriorated due to lack of maintenance and the changes to building regulations for fire safety. Arte were approached by Countryside and Shepherds Bush Housing Association to undertake a series of initial intrusive investigations on all the facades, walkways, roofs and terraces.

Morris House is a complete building refurbishment. It was built in 2005 and has since deteriorated due to lack of maintenance and the changes to building regulations for fire safety.

Issigonis House

Issigonis House is a complete re-cladding of a 135 unit residential building for Shepherds Bush Housing Group and Countryside Properties in Acton as part of their building safety works. Arte Construction won the project through a competitive tendering process and worked with the client team collaboratively to fully understand the requirements for the remedial works.

Issigonis House is a complete re-cladding of a 135 unit residential building for Shepherds Bush Housing Group and Countryside Properties in Acton as part of their building safety works.